What Do You Do When a School Site Has Run Out of Room?

Most established independent schools in NSW sit on land they were given or bought decades ago, in suburbs that have filled in around them. Enrolment grew, the buildings spread, and at some point there was no obvious place left for the next one.

When a school site has run out of room, the first idea is usually to buy the house next door. Sometimes that’s the right answer. But there are four other ways to gain room, and a school only knows buying is the best of them once all five have been tested side by side.

What are the options when a school site is full?

There are five: buy adjoining land, lease it, build up, replace a building that’s reached the end of its life, or reclaim space on the site that isn’t being used well.

They aren’t equivalent, and the differences go beyond cost. Each one commits the school to something different for the next twenty years. Buying is permanent and expensive, and gives the most freedom over what’s built. Leasing costs less up front but limits what can go on the land. Building up is often the cheapest way to gain area and the hardest to get through approval.

Testing them together matters because a school that has only looked at buying will pay for buying, whether or not it was the best of the five.

Can a school lease land instead of buying it?

Yes, and it’s worth looking into early, particularly where the land next door is owned by a government department.

Government-owned land beside a school is more common than it looks. It can be surplus, underused, or held for a purpose that no longer applies. A lease can give a school the use of it without the cost of buying it, and for some schools that decides whether the project goes ahead at all.

What a lease changes is what can go on the land. A lease with a fixed term suits playing fields, outdoor learning, parking and lighter structures far better than a permanent building the school expects to use for fifty years. So the design follows the lease terms: work out how long the school can hold the land and on what conditions, then decide what belongs there. A design drawn up before the lease is settled usually has to be redone.

What happens when a campus sits across more than one land title?

The campus works as one place, but legally it’s several pieces of land, and that creates real design constraints.

Site plan showing buildings spread across several adjoining land titles, each lot marked at 664.3 square metres, with the title boundaries drawn in red.

A school that has grown by buying neighbouring properties often sits across two, three or more land titles. Each title has its own boundaries, and building rules are written around boundaries. The issues that come up are practical:

  • Boundaries and setbacks. Whether a building can cross the line between two titles at all, and what has to happen first if it does. A building near that line may not meet the required setback, which can lead to a Performance Solution for fire rating, an engineered alternative to the standard rules that adds time and cost.
  • How the site is defined. The consent authority, usually the council, decides what counts as “the site” for an application. That affects setbacks, floor area calculations and what has to be assessed.
  • Services. Pipes, cables and drainage that cross from one title to another may need easements, a legal right for them to be there.
  • Accessibility. Some accessibility provisions are worded around site boundaries, which gets tricky when a campus has several.
  • What’s already on each title. Easements, covenants (restrictions on how the land can be used), rights of way and mortgages stay with the land, whatever the school’s plans.
  • Consolidation. Combining the titles into one can be an option where the same entity owns them all. It’s much harder with different owners or different lease arrangements.

Sorting out the titles isn’t architectural work, but it shapes what can be designed. It involves a surveyor and the school’s lawyers, and it runs on its own timetable, which is rarely as short as the school expects.

On a multi-title campus I’d want the title position understood before concept design rather than during it. Otherwise the design gets redrawn around a constraint nobody checked.

Can you build up instead of out?

Often, and it’s the option schools tend to give the least weight.

Adding a storey to an existing building, or replacing a single-storey building with two or three storeys, gains area without giving up any open ground. On a full campus that matters more than a straight construction cost comparison shows, because open ground is usually the scarcest thing the school has.

It needs testing early and honestly. Can the existing structure and foundations take another level, or would they need so much work that replacing the building is better value? What does the extra height do to the neighbours, to overshadowing, and to the approval pathway? And how does the school keep using the building, or the area around it, while the work happens? That’s a question about access and keeping students separated from the work. It needs answering in the design, before it becomes a construction problem.

What’s already on the site that isn’t earning its keep?

Usually more than the school thinks. A paved area nobody uses, a building kept because removing it never came up, a service yard sized for deliveries that changed years ago.

Every established campus has some of this. It builds up because there’s never a reason to review it, and each piece is too small to justify a project on its own. Looked at together during design, they can add up to a real share of the area the school was about to buy, and the school already owns it.

What does all this change about the design process?

It moves the property work to the front, alongside the design, rather than leaving it as a separate job for the business manager.

On a tight campus, the property questions and the design are one problem. What the school can buy or lease, what the titles allow and what can be built all affect each other, so they need answering at the same time. If they’re worked through one after another, the later answers usually send the earlier ones back for another round. We run them in parallel during design, with the surveyor and the school’s advisers involved early.

Test all the options before committing to one

A school site that’s run out of room has more options than the obvious one. Buying, leasing, building up, replacing and reclaiming each commit the school to something different for decades, so all five deserve testing before any of them is chosen.

If your campus is full and the board is being asked to approve a purchase, that’s the moment to test the alternatives properly.